Construction safety is not a compliance checkbox—it is a core project discipline that protects workers, building occupants, and ongoing operations. At South Coast Improvement Company, we integrate safety planning from the earliest pre-construction phase through final completion, with particular focus on occupied renovations in healthcare, senior living, education, hospitality, and commercial settings.
We do not measure a successful construction project solely by its appearance, budget, or completion date. A truly successful project must also protect every worker, resident, patient, student, guest, employee, and visitor affected by the work. At South Coast Improvement Company, we believe construction safety begins long before crews arrive at the job site. It starts during planning and continues through every inspection, delivery, work phase, and final walkthrough.
View Our Work
Explore some of South Coast Improvement Company’s latest construction and renovation projects.
Brookdale Battery Park City – Brookdale Senior Living
Carefully executed within an occupied senior living environment South Coast Improvement Company completed selective interior renovations at Brookdale…
View Project
Brookdale Cushing Park – Brookdale Senior Living
Critical 2-part phasing plan stayed within budget, on schdeule, & with no disruption to residents. South Coast Improvement…
View Project
Village Clubhouse at Ann’s Choice
Occupied renovations were completed within an active Independent Living community with minimal disruption to residents and daily operations.…
View ProjectConstruction sites are inherently hazardous environments under any circumstances. Those risks become more complicated—and the responsibility far greater—when construction occurs inside an occupied or operational property. In 2023, approximately one in five workplace deaths in the United States occurred in the construction industry. The International Labour Organization has estimated that at least 60,000 fatal construction accidents occur worldwide each year. These numbers reflect real people and real operations affected by preventable incidents.
Essential construction site safety practices help prevent injuries, fatalities, operational disruptions, legal problems, and financial losses. Throughout this post, we explain how we use planning, training, communication, supervision, and hazard control to promote safe construction operations—particularly in the complex, occupied environments where we specialize.
Why Construction Safety Matters Across the Construction Industry
Safety affects everyone connected to a construction project. Workers, subcontractors, clients, occupants, visitors, emergency responders, and surrounding communities all have a stake in how safely a job site is managed. This is not an abstract principle—it is a practical reality that shapes every decision we make from day one.
How Does Construction Safety Protect Workers and Building Occupants?
Construction workers may encounter changing conditions, heavy equipment, power tools, elevated surfaces, temporary electrical systems, hazardous substances, moving vehicles, and active work zones—sometimes all on the same day. Worker safety requires more than handing out hard hats and safety vests. Employers and project leaders must identify potential hazards before work begins and build safety measures around the specific job site, scope of work, equipment, trades, and people using the property.
Appropriate personal protective equipment—including hard hats, gloves, safety glasses, safety footwear, high-visibility clothing, hearing protection, respiratory protection, and fall protection equipment—forms one part of a larger safety management system. OSHA construction standards require PPE suited to the hazards workers may encounter, and that equipment must fit properly, be maintained correctly, and be paired with proper training. PPE alone does not make a construction site safe. It is a last line of defense, not a substitute for hazard elimination.
In occupied environments, construction site safety must also protect people who are not members of the construction crew—residents in senior living communities, patients and clinical staff in healthcare facilities, students and faculty on school campuses, hotel guests, office tenants, retail customers, and residents in affordable housing developments. Each of these groups brings different vulnerabilities, routines, and requirements that must be factored into every phase of work.
What Are the Financial and Operational Consequences of Construction Accidents?
The consequences of construction accidents extend well beyond the immediate incident. Serious injuries or fatalities carry human costs that no schedule or budget can offset. From a project perspective, accidents can produce lost work time, medical and insurance costs, damaged equipment or property, schedule delays, stop-work orders, OSHA citations, financial penalties, legal expenses, reputational damage, and significant disruption to the client’s business or facility.
Preventive measures are more effective and less costly than responding to an incident after it happens. We view safety planning as an investment in project performance. When hazards are identified early and responsibilities are clear, teams can work more confidently and projects are less likely to experience preventable disruptions.
What Do OSHA Safety Regulations Require From Construction Companies?
Construction safety regulations in the United States are primarily governed by the Occupational Safety and Health Administration. OSHA standards address fall protection, electrical safety, excavations and trenches, scaffolding and ladders, personal protective equipment, hazard communication, emergency action plans, equipment operation, respiratory protection, and recordkeeping and incident reporting.
During fiscal year 2023, OSHA conducted 34,221 federal inspections. Construction companies must comply with applicable federal, state, and local safety regulations. Noncompliance can lead to citations, substantial fines, project interruptions, and serious legal exposure. That said, legal compliance is only the minimum standard. A strong safety culture should aim to prevent incidents, not simply avoid penalties.
What Does a Strong Construction Safety Culture Look Like?
A safety culture is an environment in which everyone—from project managers to subcontractors—accepts responsibility for identifying and addressing hazards. A proactive safety culture encourages workers to report hazards without fear of retaliation, gives supervisors authority to stop unsafe work, makes safety expectations clear to all personnel, uses regular toolbox talks and safety meetings, and reinforces training as site conditions change. It reviews near misses and incident reports, recognizes safe behavior, and holds every person accountable for following established safety protocols.
At SCIC, safety is a non-negotiable performance driver. Our values of team accountability, respect, transparency, and doing what is right are not separate from our safety program—they are the foundation of it.
Common Safety Challenges in Complex Construction Projects
OSHA identifies four construction hazards—known as the “Focus Four”—that deserve consistent attention during planning, training, inspections, and daily operations: falls, struck-by incidents, electrical hazards, and caught-in or caught-between incidents. Understanding each one helps us build more effective job site safety programs from the start.
How Do Falls Happen on Construction Sites, and How Can They Be Prevented?
Falls can occur from roofs, scaffolding, ladders, open floors, stairways, elevated platforms, unprotected edges, floor openings, and improperly used equipment. In 2016, falls accounted for approximately 384 of 991 construction fatalities nationwide. In the roofing industry that same year, falls accounted for 92 of 115 total fatalities—a striking concentration of risk in a single hazard category.
Effective fall prevention requires guardrail systems, safety nets, personal fall arrest systems, properly selected ladders, secure scaffolding, controlled access zones, and warning lines when appropriate. Equally important are regular inspections before use, fall prevention training, competent-person supervision, and keeping walking and working surfaces clear of debris. Scaffolding, ladders, and fall protection measures consistently appear among OSHA’s most frequently cited construction standards. Workers must understand how to inspect, wear, connect, and use personal fall arrest systems correctly—not just have them available.
What Electrical Hazards Are Most Common on Construction Sites?
Electrical hazards on construction sites include damaged extension cords, exposed wiring, improper grounding, overloaded circuits, temporary power systems, wet conditions, contact with overhead power lines, defective power tools, unmarked energized systems, and incorrect lockout or shutdown procedures. Electrical hazards can cause shocks, burns, fires, explosions, serious injuries, and fatalities.
Preventive measures include regular inspection of cords, tools, outlets, and electrical equipment; maintaining a safe distance from energized lines; using ground-fault circuit interrupters where required; removing damaged tools and cords from service; clearly labeling energized systems; and training workers to recognize electrical hazards before they encounter them. In occupied properties, electrical work must be coordinated carefully with facility representatives to avoid unexpected outages or interruptions to critical systems.
How Can Teams Reduce Struck-By and Caught-In Hazards?
Struck-by incidents may involve moving construction vehicles, falling tools or materials, swinging equipment, flying particles, improperly secured loads, and crane or lifting operations. Controls include separating pedestrian and vehicle routes, using high-visibility clothing, establishing controlled delivery and staging areas, installing barricades and warning signs, and requiring trained equipment operators.
Caught-in and caught-between hazards involve trench cave-ins, unguarded machinery, rotating equipment, demolition activities, and tight work areas. OSHA requires that workers in trenches five feet or deeper have an adequate protective system in place unless the excavation is made entirely in stable rock. Protective options include sloping, benching, shoring, or shielding. A competent person must evaluate conditions, select the correct system, and conduct trench inspections at the start of each shift, after rainstorms, and whenever site conditions change.
What Chemical, Hazardous Material, and Fire Risks Exist on Active Job Sites?
Renovation projects can uncover hazardous substances—silica dust, asbestos, paints, adhesives, solvents, and combustible materials—that were not visible during initial planning. Hazard communication programs, accessible safety data sheets, proper labeling, worker training, respiratory protection, ventilation, spill-response procedures, and hot-work permits are all part of managing these risks responsibly. Fire prevention and safe storage of combustible materials deserve equal attention, especially in enclosed or partially occupied spaces.
Photo by Jeriden Villegas on Unsplash
How SCIC Protects People, Property, and Construction Operations
This is where general safety principles meet the practical realities of complex, active environments. We do not copy a safety plan from one project and apply it to another. We build each program around the specific facility, the specific scope of work, and the specific people affected.
What Should a Comprehensive Construction Safety Program Include?
A comprehensive safety program should address project-specific hazards, roles and responsibilities, safety management procedures, subcontractor expectations, required training, PPE requirements, emergency procedures, equipment inspections, hazard reporting, incident reporting, fall protection, electrical safety, hazard communication, occupant protection, site access, delivery and staging procedures, and daily cleanup. We develop safety plans around the realities of each facility, each phase of work, and each group of people affected by the project.
How Does Hazard Identification During Pre-Construction Reduce Risk?
Identifying potential hazards before work begins is one of the most effective ways to reduce construction site risk. During pre-construction and property assessment, we evaluate existing building conditions, structural concerns, mechanical and electrical systems, occupant traffic patterns, emergency routes, access restrictions, utility shutdowns, environmental hazards, fire risks, and the presence of any hazardous substances.
We follow the hierarchy of controls: eliminate the hazard where possible, substitute a safer process or material, apply engineering controls, implement administrative controls, and then require appropriate PPE. Protective equipment should never replace stronger controls when a hazard can be eliminated or engineered out of the work.
Why Are Regular Safety Inspections Important on Active Construction Sites?
Daily site walks and inspections are a core safety management practice. Regular inspections help identify damaged tools, missing guards, unprotected openings, electrical hazards, blocked exits, trip hazards, unsafe material storage, inadequate barriers, changes in site conditions, and workers using incorrect PPE. While OSHA mandates specific competent-person inspections for activities such as trenching, daily site supervision as a whole reflects a strong safety culture—not just regulatory compliance. Our construction management services include daily site supervision and safety compliance as standard components of every engagement.
Tools and equipment must be appropriate for the task, operated by trained workers, properly maintained, stored safely, used according to manufacturer instructions, and reinspected when work phases change. Damaged tools and equipment must be removed from service immediately.
How Does Proper Training and Regular Toolbox Talks Improve Site Safety?
Training supports hazard recognition, safe equipment operation, and emergency response. Topics include fall prevention, ladder and scaffold safety, electrical safety, PPE use, hazard communication, respiratory protection, emergency procedures, equipment operation, and occupied-site protocols. One-time orientation is not enough on a changing construction site. We reinforce training regularly as conditions, crews, and scopes of work evolve.
Toolbox talks allow teams to address the work scheduled for that day, new hazards, recent near misses, weather-related risks, changes in access, new equipment, and questions from workers. These conversations keep safety awareness active rather than passive.
What Communication Channels Should Be Established for Hazard Reporting?
Workers must know who to contact about a hazard, how to submit a safety concern, when work should stop, how hazards will be corrected, and where safety documents are located. Open communication among project managers, superintendents, workers, subcontractors, facility leaders, security teams, maintenance personnel, and emergency services is not a courtesy—it is a safety control. A proactive safety culture makes hazard reporting straightforward and free from fear of reprisal.
Every occupied facility also requires a coordinated emergency response plan developed before an incident occurs. The plan should account for emergency contacts, evacuation routes, assembly areas, fire response, medical emergencies, hazardous material spills, severe weather, utility failures, structural incidents, and people who may require additional assistance. Regular drills ensure workers and occupants are familiar with evacuation routes, assembly locations, and their specific responsibilities. Effective communication is critical when those plans need to be executed.
Building Safely in Occupied and Active Environments
Occupied renovation work demands a higher level of planning because the construction team must protect both workers and the people who continue to use the building. We describe occupied renovation as a core competency. Our work spans technically demanding, multi-phase projects completed while facilities remain fully operational—and that requires deliberate safety integration at every level.
How Do You Separate a Construction Site From Occupied Areas of a Building?
Physical controls include temporary walls and barriers, controlled entrances, locked work zones, dust containment, negative air systems when required, protected walkways, clear signage, floor and surface protection, secure material storage, and planned debris removal routes. These barriers must be inspected and adjusted as construction operations move through different phases of the building.
Equally important is maintaining safe access and emergency routes throughout the project. Entrances, exits, ADA-accessible pathways, emergency egress, fire department access, and resident or patient movement must all be planned before work begins and updated as conditions change. Construction activity should never block emergency routes or leave building occupants uncertain about how to move safely through their space.
What Construction Safety Considerations Apply to Healthcare and Senior Living Environments?
Healthcare facilities and senior living communities introduce a heightened level of responsibility. Patients, older adults, memory-care residents, and people with mobility limitations cannot simply be asked to reroute or wait. Construction activity in these environments must account for infection-control procedures, dust containment, noise and vibration management, secure work zones, utility coordination, and maintaining emergency access at all times.
We plan our work around care routines, clinical schedules, and facility operations—not the other way around. The contractor must respect both the safety requirements of the job site and the dignity of the people who call that building home or rely on it for medical care.
How Does SCIC Manage Construction Safety in Education, Hospitality, Retail, and Office Settings?
Each sector carries its own requirements. In education, we separate students from active work zones, coordinate around class schedules, secure tools and materials between shifts, and schedule disruptive work during lower-occupancy periods. In hospitality, we protect guests from noise, dust, and unsafe access while maintaining clear pathways and coordinating deliveries discreetly. In retail, we separate customers from construction operations, protect entrances and checkout areas, and coordinate around business hours. In office environments, we manage utility shutdowns carefully, control indoor air quality and noise, and communicate schedule changes to tenants in advance.
In every case, clear and consistent communication is not just a customer-service practice—it is a safety tool. In an active facility, people need to know what is happening, where it is happening, and how it may affect their normal routines. Clear communication prevents confusion and helps everyone make safer decisions.
Choosing a Construction Partner With a Strong Safety Culture
Property managers, developers, institutional leaders, and capital planning teams have every right to scrutinize how a contractor manages safety before signing a contract. The right questions include: How is safety incorporated into pre-construction planning? Who manages safety on the job site? How frequently are site inspections conducted? How are subcontractors evaluated for safety compliance? How are occupied areas physically separated from construction operations? How does the contractor coordinate emergency procedures with the facility? How are incidents and near misses documented and shared?
A contractor’s answers reveal whether safety is a genuine operational priority or a line in the proposal. Look for specific processes, not general assurances.
We are a family-founded construction company with decades of experience in complex, occupied renovations across senior living, healthcare, education, hospitality, affordable housing, retail, and office environments. Our single-source model provides one point of accountability across design and construction, which simplifies communication and reduces the risk of coordination failures that contribute to safety incidents. Currently, 91% of our work comes from repeat clients—a figure we attribute directly to consistent delivery, transparent communication, and a safety-first approach that clients trust project after project.
Photo by Pop & Zebra on Unsplash
Start Your Project With Safety, Clarity, and Confidence
Effective construction safety requires early planning, a comprehensive safety program, proper training, hazard recognition, daily supervision, regular inspections, appropriate PPE, clear communication, emergency preparation, and accountability at every level. None of these elements can be addressed in isolation, and none of them can be added as an afterthought once work is underway.
This is especially true when residents, patients, students, guests, employees, or customers remain in the building throughout the project. The standard for safety in those environments is not just regulatory compliance—it is the full protection of people who have no margin for construction-related incidents.
At South Coast Improvement Company, we understand that every construction decision affects people. That is why we plan carefully, communicate clearly, and maintain a safety-first approach from the earliest project assessment through final completion. Whether we are renovating a senior living community, modernizing a healthcare facility, improving a school, refreshing a hotel, or upgrading an active commercial property, our goal is to deliver excellent work while protecting the people and operations that depend on the space.
Schedule a Project Assessment Today. Planning a renovation, expansion, or complex construction project? Partner with a team that understands safety, occupied environments, and operational continuity. Contact South Coast Improvement Company to discuss your goals and receive a customized project plan.
Helpful Resources for Understanding Our Construction Services
Successful construction begins with informed decisions, clear communication, and the right team at every phase. At South Coast Improvement Company, we provide integrated services that help clients move from initial planning and property evaluation through design, construction, and closeout.
The resources below offer additional information about design-build services, preconstruction planning, construction management, and property survey and assessment services. They are especially helpful for owners and operators planning new construction, adaptive reuse, occupied renovations, infrastructure improvements, and capital upgrades.
Design + Build Services
Design-build brings design, engineering, and construction together under one contract. Instead of requiring the owner to coordinate separate designers and contractors, one integrated team manages the process from early concepts through construction. This structure encourages collaboration, improves accountability, and allows design and construction planning to overlap when appropriate.
- South Coast Improvement Company: Design + Build Services | Learn how our single-source design-build model combines design, engineering, budgeting, constructability, and construction under one accountable team.
- Design-Build Institute of America: Design-Build Best Practices | Explore recommended practices for procuring, contracting, and successfully executing design-build projects.
- DBIA Project Delivery Primer | This resource explains how owners can compare project delivery methods and select an approach that supports their goals.
- American Institute of Architects: Primer on Project Delivery Terms | Review clear definitions of design-build, design-bid-build, construction management at risk, and other common delivery structures.
- Associated General Contractors of America: Design-Build Overview | Learn how combining design and construction contracts creates a single point of responsibility for project delivery.
- Federal Highway Administration: Design-Build Method | See how design-build can allow design and construction activities to overlap while supporting cost, schedule, quality, and innovation goals.
Preconstruction Services
Preconstruction is the planning and coordination that happens before physical construction begins. It may include budget development, estimating, constructability reviews, schedule planning, phasing, logistics, subcontractor input, procurement planning, and risk analysis. Thorough preconstruction is especially important for occupied facilities and renovations where hidden conditions or operational requirements can affect the project.
- South Coast Improvement Company: Preconstruction Services | Learn how we use cost modeling, constructability reviews, phasing, scheduling, risk analysis, and logistics planning to prepare projects for construction.
- Autodesk: What Is Preconstruction? | This guide explains the purpose of preconstruction and how early planning supports budgets, communication, feasibility, and constructability.
- Procore: The Preconstruction Phase | Review the major stages of preconstruction, including design coordination, estimating, bidding, scheduling, procurement, and mobilization.
- Autodesk: How to Learn Construction Estimating | Learn how construction estimates help owners and project teams evaluate costs, resources, budgets, and overall project feasibility.
- Procore: Constructability Principles | Explore how constructability reviews use real-world construction knowledge to identify design conflicts, inefficiencies, and installation challenges before work begins.
- Lean Construction Institute: Target Value Delivery | Learn how teams can design and plan around an owner’s budget and project priorities rather than waiting until design is complete to address costs.
- Lean Construction Institute: Last Planner System for Design | This resource explains collaborative planning practices that improve coordination, workflow, handoffs, and milestone management during design and preconstruction.
- U.S. Green Building Council: Building Design and Construction Guide | Review guidance on integrated planning, goal setting, sustainability, building performance, and collaboration among owners, designers, and construction teams.
Construction Management
Construction management provides professional oversight of a project’s schedule, cost, scope, quality, safety, and daily execution. Construction managers coordinate stakeholders, supervise field activities, manage subcontractors, monitor progress, document decisions, address risks, and help keep the work aligned with the owner’s expectations.
- South Coast Improvement Company: Construction Management | Learn how we manage site supervision, safety compliance, subcontractor performance, cost reporting, quality control, communication, and closeout.
- Construction Management Association of America: What Is Construction Management? | Review a clear explanation of how construction managers represent owners and oversee schedule, cost, scope, function, quality, and safety.
- CMAA Owner Resource Center | Find owner-focused guides covering professional construction management, program management, project delivery methods, and construction manager responsibilities.
- CMAA Construction Management Standards of Practice | Explore the recognized areas of professional construction management, including contract administration, schedule, cost, quality, safety, risk, and technology management.
- Federal Highway Administration: Construction Manager/General Contractor Delivery | Learn how a construction manager can provide early constructability, pricing, scheduling, and risk feedback before transitioning into construction.
- Procore: Construction Management and the Role of a Construction Manager | This guide walks through construction management responsibilities during preconstruction, construction, turnover, and project closeout.
- OSHA: Construction Management Industry Overview | Review how construction managers integrate project controls and safety practices into planning, design, field operations, and jobsite management.
- Construction Industry Institute: Project Controls for Construction | Learn how estimating, cost control, scheduling, change management, progress tracking, and forecasting help teams measure and manage project performance.
Property Survey & Assessment Services
Property survey and assessment services help owners understand a site or facility before making major construction or capital-planning decisions. Depending on the property and project scope, an assessment may examine building systems, physical deficiencies, immediate repair needs, future replacements, site conditions, operational performance, accessibility, environmental risks, and estimated capital costs.
- South Coast Improvement Company: The Importance of a Property Survey | Learn how reviewing property boundaries, site characteristics, access, utilities, and existing conditions can support commercial development planning.
- ASTM E2018: Property Condition Assessment Standard | Review the recognized framework for evaluating commercial property improvements, documenting physical deficiencies, and preparing a property condition report.
- Whole Building Design Guide: Building Assessment Tool | Explore a standardized tool for collecting information during facility condition assessments, energy audits, equipment inventories, and resilience reviews.
- HUD Capital Needs Assessment Tool | Review how capital needs assessments identify repair requirements, estimate useful life, and support long-term financial planning for multifamily properties.
- U.S. Environmental Protection Agency: All Appropriate Inquiries | Learn how environmental due diligence evaluates a property’s environmental conditions and identifies potential contamination or liability concerns.
- EPA Revitalization-Ready Guide: Reuse Assessment | Explore the different forms of environmental and real estate due diligence used to evaluate zoning, building conditions, liens, encroachments, contamination, and redevelopment potential.
- Whole Building Design Guide: Existing Building Commissioning | Learn how building walk-throughs, equipment reviews, system testing, staff interviews, operational data, and documentation can uncover performance problems and opportunities for improvement.
Build With Greater Clarity and Confidence
Every project presents different goals, existing conditions, operational requirements, and risks. The right combination of assessment, preconstruction planning, project delivery, and construction management gives owners a clearer path forward.
At South Coast Improvement Company, we work as a true partner throughout the construction process. Whether you are considering a ground-up development, an adaptive reuse project, an occupied renovation, or a fast-turnaround capital improvement, our team helps you understand the property, establish a realistic plan, manage construction, and deliver the work with confidence.
Contact South Coast Improvement Company to discuss your upcoming project.
Frequently Asked Questions About Construction Safety
What is construction safety and why does it matter?
Construction safety refers to the policies, practices, and systems used to protect workers, building occupants, and property during construction activities. It matters because construction is one of the most hazardous industries in the United States—accounting for approximately one in five workplace deaths—and because preventable incidents carry serious human, financial, and operational consequences.
What are OSHA’s Focus Four construction hazards?
OSHA identifies falls, struck-by incidents, electrical hazards, and caught-in or caught-between incidents as the four leading causes of construction fatalities. These categories are the foundation of most safety planning and training programs because they account for the majority of serious injuries and deaths on construction sites.
How does construction safety work differently in occupied buildings?
In occupied buildings, safety programs must protect both the construction crew and the people continuing to use the facility. This requires physical barriers between work zones and occupied areas, coordinated emergency routes, dust and noise control, utility shutdown planning, and clear communication with facility leadership, residents, staff, and visitors throughout the project.
What should property owners ask when evaluating a contractor’s safety practices?
Key questions include how safety is incorporated into pre-construction planning, who manages safety on site, how frequently inspections occur, how subcontractors are evaluated, how occupied areas are separated from construction zones, and how incidents and near misses are documented. Contractors who can answer these questions with specific processes—not general statements—demonstrate a genuine safety culture.
What is the difference between OSHA compliance and a strong safety culture?
OSHA compliance sets the legal minimum for construction site safety. A strong safety culture goes further by proactively identifying and eliminating hazards, encouraging workers to report concerns without fear of retaliation, holding all personnel accountable for safety behavior, and continuously improving based on inspections, near misses, and training. Compliance prevents penalties; culture prevents incidents.
How do regular toolbox talks contribute to construction site safety?
Toolbox talks are brief daily or weekly safety meetings held with the construction crew before work begins. They address the specific tasks planned for that day, any new hazards introduced by changing conditions, recent near misses, equipment updates, and worker questions. Regular toolbox talks keep safety awareness active and give workers the information they need to make safer decisions throughout the shift.
What role does pre-construction planning play in managing construction safety risks?
Pre-construction planning is where the most impactful safety decisions are made. Identifying hazards before crews arrive—including structural concerns, hazardous substances, utility conflicts, occupant traffic patterns, and emergency access routes—allows the project team to apply the hierarchy of controls and build safety into the work plan rather than react to incidents after they occur.