Our work in senior living has brought us to Florida. Here are a few projects that were recently completed in the sunshine state:
Holiday Las Palmas – Palm Coast, FL
Interior renovation of an occupied senior living facility. In addition to the common area renovation, 20 vacant units were renovated with new lights, flooring and paint.
Project Highlights:
• Construction of new walls
• Installation of new flooring throughout the building
• Painting throughout the building
• Replacement of all light fixtures and electrical devices
• Installation of new millwork
View Our Work
Country Club Heights
South Coast Improvement Company recently completed extensive renovations at Country Club Heights, an independent living, assisted living & memory care community in Woburn, Massachusetts. The project involved a variety of updates designed to enhance the building’s...
Harrington Hall Administrative Suite & Labs – Massachusetts Maritime Academy
South Coast Improvement Company has spearheaded the transformative renovation of Harrington Hall at Massachusetts Maritime Academy, a project that embodies our unwavering commitment to excellence in educational environments. This ambitious endeavor will revitalize the...
Holiday Marion Woods – Ocala, FL
Interior renovation of an occupied senior living facility. In addition to the common area renovation, 18 vacant units were renovated with new lights, flooring and paint.
Project Highlights:
• Construction of new walls
• Installation of new flooring throughout the building
• Painting throughout the building
• Replacement of all light fixtures and electrical devices
• Installation of new millwork
Atria Willow Wood – Ft. Lauderdale, FL
Interior renovation of an occupied two building senior living facility campus with 220 resident units. In the course of the renovation, the city required a pre existing drainage problem addressed in the commercial kitchen. This necessitated digging up the existing pipe that went right down the main corridor of one of the buildings. We successfully coordinated with on site staff to do the work in such a way that was safe to senior clientele and involved minimum disruption.

Building 2
• Opened up the front entrance way
• Repurposed many common spaces to include a theater, a health club, a private dining room, an arts and crafts building and piano lounge bar
• Ground up construction of a two story addition
• Complete upgrade of all finishes including millwork, flooring, paint, lighting, plumbing, and fire alarm system